This project involved a large Front End Loader with a fork attachment. It was used to lift logs at a Log Yard. The fork clamp hydraulic cylinder pin had come loose on one side due to wear in the mounting holes. To solve this problem, we bored the holes over sized and then installed hard bushings. The first picture shows the machine set up ready to bore.

Log Forks

The picture below is of the finished bore with the hard bushings installed.

log forks repaired